CMMI Institute

« Appraisal Overview

Anjie Wireless Technology (Suzhou) Co.,Ltd (安洁无线科技(苏州)有限公司)

Software department (软件组)

Appraisal Details

Organization

Anjie Wireless Technology (Suzhou) Co.,Ltd (安洁无线科技(苏州)有限公司)

Organizational Unit

Software department (软件组)

Appraisal Team Leader

Subrata Guha

Partner

SPA Enterprise Services

Sponsors

Ming Liang

Appraisal Type

Benchmark

Last day On-site

2021/11/26

Appraisal Expiration Date

2024/11/26


Software department Project Description

Organizational Unit

Software department

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

96.6%

Sample Size - Projects

87.5%


Project Name

EPG

Project Type

Organizational Project

Project Description

EPG is established at org level for process improvement and involved in process facilitation, implementation, and sustainment activities.

Number of People

1

Location

Suzhou , Jiangsu China

Subgroup


Project Name

OT/HR

Project Type

Organizational Project

Project Description

Training function is part of HR function

Number of People

1

Location

Suzhou, Jiangsu China

Subgroup


Project Name

QA

Project Type

Organizational Project

Project Description

This function is responsible for Process auditing activities at organizational level

Number of People

1

Location

Suzhou, Jiangsu China

Subgroup


Project Name

CM

Project Type

Organizational Project

Project Description

This function is responsible for Configuration management activities at organizational level .

Number of People

1

Location

Suzhou, Jiangsu China

Subgroup


Project Name

VA signal software development project

Project Type

OU Project

Project Description

The project is an embedded software, which mainly completes the information exchange between the wireless charging system and the VCU of the vehicle, and controls whether the charging system needs to work through the on-off information of the vehicle; It controls the internal process of wireless charging system, including initialization, communication establishment, position alignment and power transmission; Fault handling mechanism and other tasks, such as the protection of abnormal power supply, communication timeout and other functions.

Number of People

6

Location

Suzhou, Jiangsu China

Subgroup

Product


Project Name

Zhiji local control software development project

Project Type

OU Project

Project Description

The project is embedded software, is a customer project, complete 7KW power output. The project mainly completes the power factor adjustment and inverter control of the power supply, which never meets the requirements of the transmitter for the power signal; Control the state of rectifier components, the general state of standby, charging, shutdown and other processes; Fault handling mechanism and other tasks, such as the protection of input overvoltage, communication timeout and other functions.

Number of People

7

Location

Suzhou, Jiangsu China

Subgroup

Customer projects


Project Name

VA power software development project

Project Type

OU Project

Project Description

The project is embedded software, the company's self-developed platform software, mainly to complete the rectification work of the wireless charging system, according to the charging demand command to control the duty cycle of rectifier electronic components, so as to adjust the power output; Control the state of rectifier components, the general state of standby, charging, shutdown and other processes; Fault handling mechanism and other tasks, such as the protection of output overvoltage, short circuit and other functions.

Number of People

6

Location

Suzhou, Jiangsu China

Subgroup

Product


Project Name

Wireless charging auxiliary function software development project

Project Type

OU Project

Project Description

The project is embedded software, the company's self-developed platform software, the software mainly completes the position alignment, foreign body detection and other functions. Position alignment mainly calculates the specific position of the receiving end, so as to determine whether the wireless charging equipment has charging conditions. Foreign body detection is mainly to detect whether there are metal objects on the surface of the transmitting end of wireless charging equipment, such as paper clips, coins, etc. in order to ensure safety, power transmission will be stopped when foreign bodies are detected.

Number of People

5

Location

Suzhou, Jiangsu China

Subgroup

Product


OU Description

The software development department is mainly responsible for the design and development of the company's embedded software. The software development department has 18 developers. According to the needs of different customers, it is responsible for the development and test verification of signal electronics, power electronics and auxiliary function software in automotive wireless charging. The main customers of the software group are: Great Wall Motor, Weima motor, SAIC, etc. The main customer requirements of the Department are technically refined to form software requirements, design related module functions, and make development plans according to the requirements. Software developers code according to the software requirements and function design documents, and conduct unit testing and integration. Software testers write test cases and test plans according to software requirements, conduct system testing, find problems in software, and give feedback and record.

Relevant Sampling Factors

Type of Work: Work is done differently based on the type of projects

Sampling Factor Values

Customer Projects: These projects are developed for a customer based on their requirements.

Product development: These projects are organizations own initiatives to develop different products

Subgroups

Customer projects

Product


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied