CMMI Institute

« Appraisal Overview

Zhuhai Valwell Electric Technology Co.,Ltd

R & D Center

Appraisal Details

Organization

Zhuhai Valwell Electric Technology Co.,Ltd

Organizational Unit

R & D Center

Appraisal Team Leader

Ana Rouiller

Partner

SWQuality Consultoria e Sistemas

Sponsors

Hao Chen

Appraisal Type

Benchmark

Last day On-site

2021/09/17

Appraisal Expiration Date

2024/09/17


R & D Center Project Description

Organizational Unit

R & D Center

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

98%

Sample Size - Projects

100%


Project Name

EPG

Project Type

Organizational Project

Project Description

Coordinate the development and improvement activities of the organization's software process; develop, maintain and track plans related to software process development and improvement activities; responsible for this work when it is necessary to create or revise the process related to the process área; define standards and templates for the process; collect successful experiences and failure lessons from the project, and share them within the organization; select the tools to be promoted within the organization; review the process before it is released and monitor its effectiveness after implementation; responsible for training all staff on software processes and related activities including training for new members; maintain organization database and document library including processes, procedures, etc; Publish to all personnel the progress and results of all software process development and improvement activities

Number of People

2

Location

zhuhai, Guangdong China

Subgroup


Project Name

OT

Project Type

Organizational Project

Project Description

Responsible for organizational training plan and conduct the trainings that staffs needs. works in order to improve the labor productivity and personal satisfaction with the occupation, OT function adopts various methods to invest in the education and training of all kinds of personnel, sets up strategic training goals based on the business objective, develops training programme to fill the gap in the competency matrix.

Number of People

1

Location

zhuhai, Guangdong China

Subgroup


Project Name

QA

Project Type

Organizational Project

Project Description

Assist the project manager to select the applicable standards, processes, procedures, templates, etc. for the project; develop and implement a quality assurance plan; audit, review and inspect the project activities and audit the work products of the project; record, communicate and track the non-conformance issues posted; record QA activities, output and report QA work; training and guidance.

Number of People

1

Location

zhuhai, Guangdong China

Subgroup


Project Name

Project 2(VW-T30101)

Project Type

OU Project

Project Description

The intelligent management and control system of safety tools and instruments warehouse adopts the design idea of ubiquitous power Internet of things, and uses the RFID sensing technology of Internet of things, edge computing, communication network, cloud platform, artificial intelligence algorithm and other cutting-edge technologies to realize the whole life cycle management of safety tools and instruments from procurement, distribution, use, inspection to scrapping, so as to achieve refinement, intelligence and intelligence of management.

Number of People

7

Location

zhuhai, Guangdong China

Subgroup

All Projects


Project Name

Project 1(VWJT-100)

Project Type

OU Project

Project Description

The rail transit safety interlocking system includes the functions of comprehensive error prevention locking, intelligent door control, safety interlocking, video monitoring, audible and visual warning, ground wire management, etc., and carries out safety management and control for key equipment such as operation platform, OCS disconnector, grounding device, platform door, etc. Monitor the vehicle arrival information throughout the process. With rigorous operation logic and scientific and reasonable management process, the safety control of the whole process of power off and transmission operation and stage maintenance operation in the depot area is realized, so as to make the whole maintenance operation process more safe and reliable, and technically ensure personal safety and equipment safety in the operation process.

Number of People

7

Location

zhuhai, Guangdong China

Subgroup

All Projects


Project Name

Project 3(VW-E90101)

Project Type

OU Project

Project Description

The cross platform five prevention operating system adopts advanced multimedia technology. It is an error prevention system composed of a high-performance microcomputer as the main control computer and a large screen display as the media of the system operation interface. It realizes analog operation and operation ticket management, and transmits the correct operation ticket content to the computer key with a communication adapter, The computer key is used to unlock the field equipment and receive and transmit data, and the field equipment is locked through various locks (electrical lock and mechanical coding lock). The system can also communicate with the monitoring system to realize the data sharing and information exchange of field equipment. For the equipment connected with the monitoring background, it can also realize the function of software locking. It can realize multi task parallel operation, maintenance ticket, intelligent unlocking, black box, PDA remote summons and other functions. The system uses the smart key to receive the operation ticket issued by the error proof host to perform the unlocking operation, and uses the traditional error proof lock to lock the field equipment.

Number of People

6

Location

zhuhai, Guangdong China

Subgroup

All Projects


OU Description

The R & D Center of Zhuhai Valwell Electric Technology Co.,Ltd is specialized in the research and development of power safety products, the products are widely used in power generation, transmission and transformation, distribution and power consumption, providing a strong guarantee for the safe production and operation of power system. For example: rail transit safety, Internet of things RFID sensing technology, the main development language is C language.

Relevant Sampling Factors

Contains all projects in the organizational unit: Contains all projects in the organizational unit

Sampling Factor Values

ALL: Contains all projects in the organizational unit.

Subgroups

All Projects


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied