CMMI Institute

« Appraisal Overview

Airbus Defence and Space SAU

Information Management Spain for TZIS and TZIEC4

Appraisal Details

Organization

Airbus Defence and Space SAU

Organizational Unit

Information Management Spain for TZIS and TZIEC4

Appraisal Team Leader

Jose Sancho Thomas

Partner

Process Quality Engineering

Sponsors

Jose Angel Velasco Maganto

Appraisal Type

Benchmark

Last day On-site

2021/10/28

Appraisal Expiration Date

2024/10/28


Information Management Spain for TZIS and TZIEC4 Project Description

Organizational Unit

Information Management Spain for TZIS and TZIEC4

Model or Model View

CMMI Development V2.0 (CMMI-DEV) with SAM - Maturity Level - 3

Sample Size - People

37.4%

Sample Size - Projects

40.7%


Project Name

Quality Assurance

Project Type

Organizational Project

Project Description

Responsible for performing quality assurance audits

Number of People

3

Location

Madrid, Spain

Subgroup


Project Name

Corporate Training

Project Type

Organizational Project

Project Description

Responsible for planning and monitoring the training activities

Number of People

1

Location

Madrid, Spain

Subgroup


Project Name

Purchase Department

Project Type

Organizational Project

Project Description

Responsible for establishing the agreement with the supplier

Number of People

2

Location

Madrid, Spain

Subgroup


Project Name

Process Improvement Group

Project Type

Organizational Project

Project Description

Responsible for evaluating, planning and piloting process improvements

Number of People

2

Location

Madrid, Spain

Subgroup


Project Name

44468-Digital Costing and Pricing for A400M

Project Type

OU Project

Project Description

New development whose main objective is calculate the cost and price of spare materials in the scope of A400M. Now A400M spare part prices are controlled via a MS Access database where only active contracts and quotations are considered when required by any user (no proactive upload of all available costs). A material could have different costs based on: destination customer (OCCAR/ Export) and purchase window (IP/RP). The proposed solution will be based on current DCP tool (only for LM and MRTT). Specific screens and functionality to be developed for A400M based on their specific needs.

Number of People

1

Location

Madrid, Spain

Subgroup

Project-Custom


Project Name

44419-Combat Customer Services Web Portal 2021

Project Type

OU Project

Project Description

This project has as main objectives: 1. Include improvements in functionality the visibility of spare parts. 2. New functionality for visibility of EAE repairs related to Eurofighter. 3. Update the version of the portal environment to 7.5. As an evolution of the today existing portal.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

44395-C295 and MRTT ASL ISS New Contracts

Project Type

OU Project

Project Description

Release activity on the SAP system focused on undertaking improvements in the "In Service Support" operation of the MRTT and C-295 programs for the Saudi Arabia client. It consists of the extension of some functions in SAP related to customer service in the logistics of materials necessary for the maintenance of your fleet

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

44358-Brexit - Customer Services - Support and Improvem.

Project Type

OU Project

Project Description

Development of tools in SAP that facilitate manual entry to users of customs information in dispatch documentation.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

44266-ILIAS -SAP Interface for A400M Belgium (1)

Project Type

OU Project

Project Description

As the 15th wing warehouse of the BE Defence are managed with SAP system, all the material movements will be made with this System. However BE Defence use ILIAS System as National Logistic System, it is necessary to developed an interface between both system in order that the stocks are aligned. It covers the analysis, development and implementation of all the requirements requested by the BE Customer.

Number of People

2

Location

Madrid, Spain

Subgroup

Project-Packaged


Project Name

44197- A400M Spare Prediction

Project Type

OU Project

Project Description

Spare Prediction will be the system that allows our business to provide to our customers the materials they require for the maintenance based on their specific behaviour and way of working.

Number of People

1

Location

Madrid, Spain

Subgroup

Project-Agile


Project Name

44189-TZISP2_2021 Samanta Civil - Enhancements

Project Type

OU Project

Project Description

The main objective is to be able to cover the processes necessary for the generation of technical publications based on ATA100, maintaining, as up to now, the integration with the rest of the systems involved in obtaining the manuals. Samanta Civil is an application to produce Technical Publications for MRTT, C-212, CN-235 and A330 according to the specifications determined by the ATA100 standard. The manuals for which developments will be carried out this year are the following: AMM (Aircraft Maintenance Manual), IPC (Illustrated Parts Catalog), IPL (Illustrated Parts List) and WDM (Wiring Diagram Manual).

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44183-FWSAR-STILO Maintenance

Project Type

OU Project

Project Description

Release activity on the STILO system of the Medium / Light & MRTT programs aimed at fulfilling a set of system improvement requirements received via focal point of business. These are small changes to the system associated with its evolutionary maintenance.

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44182-FWSAR-SAP SP1 Maintenance

Project Type

OU Project

Project Description

The purpose of this Enhancement is to carry out the modifications in the SAP SP1 System to implement the improvements identified for the FWSAR SAP solution, Until now we have identified this new functionalities: - Improvement of the Cockpit, already developed, to be used for the user in order to monitor the EDE messages - Execution of the Contractual CAT Testing - Modification of the Process of Automatic Demand generation for Kit, - Consumables management into Canada SAP warehouse Stock - The solution to allow Canada Plant the Direct Purchase. - Improvements detected during the real operative of the exchange of messages between DRMIS and SAP and LSMS and SAP - Support to the users

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44181-FWSAR-IDS Maintenance

Project Type

OU Project

Project Description

The objective of this Project is the adaptation of IDS, a system that facilitates the integration of the information managed in the Post-Sales Sub-Directorate, for those data that are shared between the different disciplines, and especially if they are used in the generation of products. deliverables to customers. Therefore, it will consist of making the appropriate improvements and the necessary modifications so that said system adapts to new needs, as well as the changes required due to possible problems that may arise, in this case focused on the FWSAR.

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44180-FWSAR-Samanta Maintenance

Project Type

OU Project

Project Description

The main objective is to be able to cover the processes necessary for the generation of technical publications based on AECMA1000D v4.1, maintaining, as up to now, the integration with the rest of the systems involved in obtaining the manuals. Once the current processes for the generation of C-295 technical publications have been adapted to AECMA1000D v4.1, new requirements are required to facilitate said tasks as well as improvements on existing developments. These requirements are driven by the contract with Canada (FWSAR).

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44134-TZISP2_2021 SMART - Enhacements

Project Type

OU Project

Project Description

The main objectives of the project are: * Include necessary improvements to facilitate the work flow of the authors, prioritizing the needs for the A400M. * Improve integration with other systems to be able to capture and send the information necessary for the production of newsletters and the delivery of information. It is focused in the A400M, MRTT, BOOM & TMA programs.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44105-TZISP2_2021 IDS - Enhacements

Project Type

OU Project

Project Description

It will consist of making the appropriate improvements and the necessary modifications in order to the system will be adapted to the new needs, as well as the changes required due to the possible problems that may arise. It is focus on the maintenance of the application for use by own products, MRTT and A400M.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44081-GSS2/ISSec: "COTS security survey" process support

Project Type

OU Project

Project Description

GSS2/ISSec: "COTS security survey" process support deals with the necessary modifications and evolutions to the ISSec System that have been requested by the business. This evolutions target an increase efficiency in the analysis of aircraft / GSD vulnerabilities and an enhanced user experience.

Number of People

1

Location

Madrid, Spain

Subgroup

Project-Custom


Project Name

44070-TZISP2 - 2021 A400M Sam.Militar & ePilot

Project Type

OU Project

Project Description

The objective of the project is to improve the tool for the production of technical publications in both the authoring and publishing processes. This will be achieved by detecting the possible processes that can be automated and replacing old components of the application with more modern ones that allow the production work of the document units to be shortened as much as possible.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44035-A400M CSWP - Customer Layer Portal 2021

Project Type

OU Project

Project Description

This project has as main objectives: 1. Include improvements in the Warranty claim functionality, referring to the massive loading of warranties 2. Evolve some of the existing functionalities (Engineering Documentation) 3. Update the version of the portal environment to 7.5. It is an evolution of the current portal.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44034-MRTT M&L CSWP - AM Customer Services Portal 2021

Project Type

OU Project

Project Description

This project has as main objectives: 1. Include improvements in the functionality for the exchange of information between Airbus DS and customers (Engineering documentation). 2. Evolve some of the existing functionalities (Engineering Documentation). 3. Implement new functionalities that are necessary: - Functionality for consulting audit data. 4. Update the version of the portal environment to 7.5. It is an evolution of the current portal.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

44002-MAIA Stabilization (New analytics solution develo (1)

Project Type

OU Project

Project Description

MAIA Stabilization (New analytics solution developped in 2019)

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43972-Digital Pricing. Release 2021.

Project Type

OU Project

Project Description

The project is focused in the development of new functionalities or improvements in the Digital Costing and Pricing application. These lines of improvement are identified either within the user areas or as needs for the evolution of the system. These lines of improvement will be listed in the project requirements matrix, being the responsibility of the business area responsible for the improvement project, prioritizing and approving them.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43957-Enhancement 2021 Repair Management System

Project Type

OU Project

Project Description

Recurring evolutionary maintenance activity of the repair system within SAP-SP1.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43956-Demand Planning and Logistic Network Stabilization (1)

Project Type

OU Project

Project Description

The main objective are all the modifications to the SAP Sp1 500 and SPM systems will be made, in addition to the interface between them, that are related to the Planning & Demand systems and the logistics network of the Service plants of the 1037 division

Number of People

3

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43948-MMF ISS Material Services ADS – NAP Interface 2021

Project Type

OU Project

Project Description

Release activity on the SAP system focused on undertaking improvements in the In Service Support operation of the MMF client's MRTT program. This operation has been deployed since 2020 and evolutionary maintenance is expected in 2021. Develop and implement evolutionary changes to improve the operation of the MRTT ISS. These changes will be high-level requirements defined in the portfolio corresponding to 2021, previously approved and prioritized by the user.

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43944-MRTT ML Release OA/PP/INV (SAP improvements) 2021

Project Type

OU Project

Project Description

The main objectives are: - Improvement of current functionality and implementation of new developments within the scope of Material Support (Management of offers and customer orders, dispatches and order supply chain, customer price management ..). - Support for new requirements of continuously evolving programs included in the scope of the improvement project. - Requirements of connection with the open platforms that currently exist. - It improves the possible and different internal and external interfaces between the different systems involved such as STILO, SAMANTA, IDS, OPUS 10, AIMS, SICEX, SNT, etc., among others. - Need to continue to notably improve friendliness. - Need to continue to notably improve friendliness. In the case of functionalities developed in SAP applications, continuous integration between the 'Sales & Distribution' module and the rest of the SAP modules implemented for ADS SP1 500. - R&D in technologies applicable to the programs.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43943-A400M Release OA/PP/INV (SAP improvements) 2021

Project Type

OU Project

Project Description

The main objectives are: - Improvement of current functionality and implementation of new developments within the scope of Material Support (Management of offers and customer orders, dispatches and order supply chain, customer price management ..). - Support for new requirements of continuously evolving programs included in the scope of the improvement project. - Requirements of connection with the open platforms that currently exist. - It improves the possible and different internal and external interfaces between the different systems involved such as STILO, SAMANTA, IDS, OPUS 10, AIMS, SICEX, SNT, etc., among others. - Need to continue to notably improve friendliness. - Need to continue to notably improve friendliness. In the case of functionalities developed in SAP applications, continuous integration between the 'Sales & Distribution' module and the rest of the SAP modules implemented for ADS SP1 500. - R&D in technologies applicable to the programs.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

43942-C#1 Int. (Release STILO Combat 2021

Project Type

OU Project

Project Description

Release activity on Combat's STILO system aimed tofulfill a set of system improvement requirements received via business focal point. These are small changes to the system associated with its evolutive maintenance

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43907-TZISP2 - 2021 ILS Combat SM - Enhacement

Project Type

OU Project

Project Description

The objective of the project is to improve the tool for the production of technical publications in both the authoring and publishing processes. This will be achieved by detecting the possible processes that can be automated and replacing old components of the application with more modern ones that allow the production work of the document units to be shortened as much as possible. ? Include necessary improvements to facilitate the work flow of the authors, prioritizing the needs for the EF2000 program. ? Improve integration with other systems to be able to capture information necessary for the realization of documentary units and / or publications. ? The program this project is aimed at is EF2000. ? The user department of the same is TASSD4

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43899-2020 - 2024 ILS Combat IETP (Spanish perimeter)

Project Type

OU Project

Project Description

The objective of the project is to improve the tool for the production of technical publications in both the authoring and publishing processes. This will be achieved by detecting the possible processes that can be automated and replacing old components of the application with more modern ones that allow the production work of the document units to be shortened as much as possible. ? Include necessary improvements to facilitate the work flow of authors, prioritizing the needs for the Eurofighter program. ? Improve integration with other systems to be able to capture information necessary for the realization of documentary units and / or publications. ? The programs to which this project is directed is Eurofighter. ? Its user department is TASSD.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43877-BITE Analysis for MDS

Project Type

OU Project

Project Description

Every time a flight takes place, a PFR (Post Flight Report) is generated by the aircraft (A/C). This PFR file has xml format that contains information about the faults found during the flight. In order to define the maintenance actions derived from the PFR faults, an analysis must be done. To perform this TS, a tool called BITE will be used. This application allows the user to import a PFR, store the PFR data, interchange data with other systems, perform the fault analysis and generate logbook entries that can be sent to the Logbook.

Number of People

2

Location

Madrid, Spain

Subgroup

Project-Custom


Project Name

43853-Release IP/IPC (STILO improvements) (3)

Project Type

OU Project

Project Description

Release activity on the STILO system of the Medium / Light & MRTT programs aimed at fulfilling a set of system improvement requirements received via focal point of business. These are small changes to the system associated with its evolutionary maintenance.

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43852-AIMS - A400M Integrated Material System (2)

Project Type

OU Project

Project Description

The main objectives are: 1. Finalize the migration of AIMS application and its external components (Emule, Quartz) to a modern versions in order to ensure we can have support from the providers. 2. Implemented the changed to adapt the current functionalities to the new specifications of the latest version of MSGD (Priority Surcharges, PN Evolution) 3. Implemented the Change Notes requested by the Business users along the year.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

43792-CMS-LS for TAS 2021

Project Type

OU Project

Project Description

The objectives of the Release tasks are: • The incorporation in the LS module of the CMS of those new functionalities or improvements to the existing ones identified during the operation of the system and / or as a consequence of the new Programs addressed by the user. • Get a better performance of the systems to the real needs of the moment. • Guarantee the quality of the product into production, by monitoring and controlling the evolution of its life cycle.

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43788-CMS-AB for TOQMF 2021

Project Type

OU Project

Project Description

The objectives of the Release tasks are: • The incorporation in the CMS AB module of those new functionalities or improvements to the existing ones identified in the course of the system's operation and / or as a consequence of the new Programs addressed by the user. • Get a better performance of the systems to the real needs of the moment. • Guarantee the quality of the product into production, by monitoring and controlling the evolution of its life cycle.

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43787-CMS-CM & CMS-Generic for TACP 2021

Project Type

OU Project

Project Description

The objective of this activity is to respond to the requirements requested by TACP to improve the CMS-CM and CMS-GE modules. These requirements can be: • Functional: To incorporate new functionalities into CMS or improve existing ones, either specific to CMS-CM or generic for all CMS modules. • Non-functional of: o Security o Architecture o IT infrastructure o Training

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43785-SNT & CMS for TEAIC 2021

Project Type

OU Project

Project Description

The main objective of this activity is to develop the necessary adaptations to SNT (SNT-AD, SNT-CM and SNT-DC), CMS (CMS-AD) and the interfaces of SNT and CMS with other systems (CMS, SNT, SPRINT- PROB, SIDIE and SAP), to cover the requirements approved and prioritized by TEAIC that are written in the Requirements Matrix SNT-AD-AP101_Requirements_and_Traceability_Matrix-SPRINT TEAIC_2021_v2.0.xlsm The following functionalities for SNT will be covered: • Refining, • Equipment management, • Electrical process, • Process improvements, • Management of modifications and Design Changes. The following functionalities for CMS will be covered: • Refinement, • Team management, • Process improvements. Get a better performance of the systems to the real needs of the moment. Guarantee the quality of the product put into production, through the monitoring and control of the evolution of its life cycle.

Number of People

6

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Packaged


Project Name

43784-CMS-DEX for Eurofighter 2021

Project Type

OU Project

Project Description

This Activity was born to manage the STEP-format exchanges that replaced the existing AECMA exchanges until 2001. The evolution of this Activity has expanded the type of STEP exchanges between the different Eurofighter partners and has also developed non-STEP exchanges with the former CASSIDIAN-Germany. • Among the former (STEP exchanges) are the following: 1. Modification data exchange (CM) 2. Exchange of Design Structure with the associated electronic model (PS) 3. Exchange of Design Build Standard reports (DBSs). The CM and PS exchanges are used daily by the 4 EF program partners. The DBS exchange was finalized and tested but is not used by any of the 4 partners. • Regarding the second type of exchanges, there are the following: 1. Exchange of Waivers, data and associated files. 2. Exchange of TALARION documents. Exchanges completed and tested but not being used. The following was also developed in the first months of 2012 3. XML Exchange for Modifications of the TALARION. Since this program was stopped, it is not being used either. The Activity includes the tasks of Support to the business areas that use the information from the Exchange. Mainly to the area of ??Programs for the Exchange of CM and the area of ??Design Engineering for the Exchange of PS (in both cases specific support is given to users who participate in the DPD groups of EF, IT1, IT2-CM, IT4 , ...). Other areas (Manufacturing, Quality and ILS) are also supported.

Number of People

2

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43783-CMS-CATIA 2021

Project Type

OU Project

Project Description

The objectives of the Activities are: • Extend the use of direct CMS CATIA v5 integration with PLM Vaulting as a vault system for 3D models to the Eurofighter 2000 and Tanquel 1000l multi-configured programs • Replace CASSIDIAN Optegra vaults with PLM Vaulting • Adapt the PS Send / Receive processes to CATIA v5 and PLM Vaulting • Strengthen and provide new functionalities to the direct integration of CMS CATIAv5 with PLM Vaulting • Improve the use of Productview in the Eurofighter 2000 and Tank 1000l programs The division for which the activities are carried out is Airbus Defense & Space, BL Military Aircraft. Specifically for combat aircraft (former CASSIDIAN division). The departments or areas affected by these activities are Engineering, Manufacturing and ILS of the former CASSIDIAN division, as well as Manufacturing of the former Airbus Military.

Number of People

3

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43782-CMS-Vaulting 2021

Project Type

OU Project

Project Description

The objectives of the Activities are: • Extend the use of direct CMS CATIA v5 integration with PLM Vaulting as a vault system for 3D models to the Eurofighter 2000 and Tanquel 1000l multi-configured programs • Replace CASSIDIAN Optegra vaults with PLM Vaulting • Adapt the PS Send / Receive processes to CATIA v5 and PLM Vaulting • Strengthen and provide new functionalities to the direct integration of CMS CATIAv5 with PLM Vaulting • Improve the use of Productview in the Eurofighter 2000 and Tank 1000l programs The division for which the activities are carried out is Airbus Defense & Space, BL Military Aircraft. Specifically for combat aircraft (former CASSIDIAN division). The departments or areas affected by these activities are Engineering, Manufacturing and ILS of the former CASSIDIAN division, as well as Manufacturing of the former Airbus Military.

Number of People

3

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43779-SNT Lean Develop 2021

Project Type

OU Project

Project Description

The main objective of this activity is to develop the necessary adaptations to SNT-AD, and the SNT interfaces with CATIA and OPTEGRA, to cover the requirements approved and prioritized by TEPAD-TL2 TL2 DMU Data Management GET that are written in the Requirements Matrix

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43777-SIDIE for TEPAD 2021

Project Type

OU Project

Project Description

Complete and implement the requirements not finalized in 2020 such as: synchronization improvements in the Electrical Process for SIDIE AIM and Export Control in AECMA messages for SIDIE Combat. Among the new developments to be carried out, for the moment, have been agreed: Changes in the Circuit Breakers, Include the A3-BOOM in the assignment of Methods, new STW treatment in See-Xp, adjustments in the Quality Checks, modifications in Automatic Process, unify settings, modification of P / N for Samanta ... Collaborate in Manufacturing activities for the Electrical Workshop and other initiatives such as Telemaco or Export Control, carrying out the necessary developments in SIDIE AIM and SIDIE Combat. Collaborate on the planned migrations of Windows 10, Oracle 19 and Power Builder, making the necessary changes and tests. Collaborate in the solution of the problems detected by the user during daily operations and carry out the transfers to the AM with each step to real. Guarantee the quality of the product by monitoring and controlling the phases of the activity life cycle. Participate and collaborate in audits, internal and external, in which the activity is selected.

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

43550-ASSUR licencing

Project Type

OU Project

Project Description

ASSUR software self-installation package requires the development of a Licencing model.Therefore, ASSUR initial installations (v1) shall be performed by AMSL on tablets procured by the Seller

Number of People

2

Location

Madrid, Spain

Subgroup

Project-Agile


Project Name

42776-Smart Mission (Smartforce services)

Project Type

OU Project

Project Description

Design and development SmartMission. Interoperatibity between Flops System, Mission Planners and Mission preparation systems. Creation and follow up of Missions and Flights.

Number of People

2

Location

Madrid, Spain

Subgroup

Project-Agile


Project Name

42404-TZISP2_2020 Samanta Civil - Enhancements (1)

Project Type

OU Project

Project Description

The main objective is to be able to cover the processes necessary for the generation of technical publications based on ATA100, maintaining, as up to now, the integration with the rest of the systems involved in obtaining the manuals.

Number of People

2

Location

Madrid, Spain

Subgroup

Enhancement-Custom


Project Name

42105-StepUp: Global Support Step 2 (MyMoB, KPI's.)

Project Type

OU Project

Project Description

The objective of this project is to support the “Global Support step 2” contract and develop its functionalities for its entry into service, support to the operation, improve the visibility and traceability processes of the material in the SAP system for our Local teams and increase contract control.

Number of People

2

Location

Madrid, Spain

Subgroup

Project-Agile


Project Name

41773-Export Control Management in Material Services W2

Project Type

OU Project

Project Description

The objective of this project is to reduce administrative effort and the existing risk of no-compliance in terms of Export Control by automating these activities. The solution to be designed needs to: ? Ensure compliance with the legal Export Control regulations. ? Enable a unique data base for material classifications and licences. ? Optimize the Export Control process in sales, purchasing and transfer processes. ? Guarantee the correct Export Control documentation creation for deliveries.

Number of People

1

Location

Madrid, Spain

Subgroup

Project-Packaged


Project Name

41191-MFASIS. Smart Maintenance Planning

Project Type

OU Project

Project Description

This project consists on the former MFASIS IT System, divided into two independent, autonomous but also complementary sub systems. This document also separates a few of the chapters based on this premise. SFP – IT System which enables an operator to organize the fleet according to the fleet status/availability in a visual, automated and practical way. It optimizes a subset of missions with the ACs best fulfil the requirements set. SMP – IT System which enables to plan, sort, organize and group maintenance activities (e.g. SB, OMP…) for an AC in a visual and semi-automated way applying a criteria of commonalities in terms of zones and types of tasks.

Number of People

3

Location

Madrid, Spain

Subgroup

Project-Agile


Project Name

42005-ISSec GSS2 Documentation Manager

Project Type

OU Project

Project Description

Airbus D&S shall develop an In Service Security Customer Portal. The main purposes are: • to store all the A400M security documentation, Database and , Reports accessible from OCCAR and Nations sites. • To provide a mean of transmission between OCCAR/Nations and AMSL in order to notify and exchange security sensitive information. • To provide functionalities to compose documents that need to be provided to the different A400M customers.

Number of People

1

Location

Madrid, Spain

Subgroup

Project-Custom


Project Name

42653-MRTT M&L Release OA/PP/INV (SAP improvements) 2020

Project Type

OU Project

Project Description

The main objectives are: - Improvement of current functionality and implementation of new developments within the scope of Material Support (Management of offers and customer orders, dispatches and order supply chain, customer price management ..). - Support for new requirements of continuously evolving programs included in the scope of the improvement project. - Requirements of connection with the open platforms that currently exist. - It improves the possible and different internal and external interfaces between the different systems involved such as STILO, SAMANTA, IDS, OPUS 10, AIMS, SICEX, SNT, etc., among others. - Need to continue to notably improve friendliness. - Need to continue to notably improve friendliness. In the case of functionalities developed in SAP applications, continuous integration between the 'Sales & Distribution' module and the rest of the SAP modules implemented for ADS SP1 500.

Number of People

1

Location

Madrid, Spain

Subgroup

Enhancement-Packaged


Project Name

42568-SHMSFLMS 2020

Project Type

OU Project

Project Description

The scope of the project is established by the activities within the program required by TEPAT-TL4. Product development was the subject of a previous project scope.

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

42264-CMS-AB for TOQMF 2020

Project Type

OU Project

Project Description

The main objectives of this release are: 1. The incorporation in the AB module of CMS of new functionalities. 2. Get better system performance.

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


Project Name

42228-SIDIE for TEAS 2020

Project Type

OU Project

Project Description

> Complete and implement the requirements started at the end of 2019. > Among the new developments to be carried out include: new adaptations in Automatic Labeling, treatment of Service Bulletins, changes in the visualization of SVG files, adaptations in Copy Full, multi-variant reports for EF2000, cancellation of schemes from Capital ... > Collaborate in Manufacturing activities for the Electrical Workshop and other initiatives such as T4T, Telemaco or Export Control, carrying out the necessary developments in SIDIE AIM and Combat. > Collaborate on the planned migrations of Windows 10, Oracle 18c / 19c, TFS 2018, Visual Studio 2019 and the Data Center, making the necessary changes and tests. > Collaborate in the solution of the problems detected by the user during daily operations and carry out the transfers to the AM with each change to real two transfers to the AM during the year, one in July and the other in December (this paragraph is modified due to the exceptional situation of this year and the little amount of developments uploaded to real from January to May).

Number of People

1

Location

Getafe, Madrid Spain

Subgroup

Enhancement-Custom


OU Description

This is the area of Airbus Defense and Space that has as main objective to be a key Service Provider for Airbus Defense and Space and its Clients, enabling Services Business & industrializing SW activities besides to create, protect and grow value for their Customers, Stakeholders and Partners by providing World-Class IM Services and IM Support].

Relevant Sampling Factors

Size: Based on size there are two types of work: projects and enhancements

Type of Work: Three different types of work: packaged for ERP customization, custom development using waterfall methodologies and agile methodologies.

Sampling Factor Values

Project: Design, development and delivery of a new application or system. As well as the "Running Projects" available in the Organization and other projects or activities that require this classification by client requirements.

Enhancements: Consist in modifications or improvements of an application / system developed previously. Modifications and improvements with medium / high functional complexity. They can be included in the real environment as an independent object or in a group of modifications that are packaged and delivered as only one set.

Custom: Projects or enhacements for custom applications using waterfall methodologies.

Packaged: Development of new functionalities or modifications to ERP packages.

Agile: Development of new applications using agile methodologies.

Subgroups

Enhancement-Custom

Enhancement-Packaged

Project-Agile

Project-Custom

Project-Packaged


Model View

CMMI Development V2.0 (CMMI-DEV) with SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
SAM
Satisfied
TS
Satisfied
VV
Satisfied