CMMI Institute

« Appraisal Overview

Adacel Inc. (Canada)

Engineering, Operations & Program Management Office (PMO)

Appraisal Details

Organization

Adacel Inc. (Canada)

Organizational Unit

Engineering, Operations & Program Management Office (PMO)

Appraisal Team Leader

Francois Ouellette

Partner

LogiQual

Sponsors

Bedros Nalpatian

Appraisal Type

Benchmark

Last day On-site

2021/11/11

Appraisal Expiration Date

2024/11/11


Engineering, Operations & Program Management Office (PMO) Project Description

Organizational Unit

Engineering, Operations & Program Management Office (PMO)

Model or Model View

CMMI V2.0 Development - Capability Level

Sample Size - People

69.5%

Sample Size - Projects

72.7%


Project Name

C21716-MeG Guadaloupe

Project Type

OU Project

Project Description

Development and deployment of Adacel’s Aurora system for the purpose of supporting air traffic Tower and Approach system at the Pointe a Pitre airport in Guadeloupe. The program also inclues a number of change order for enhancements: electronic flight strips dep/arr, short term conflict alerts, quick flight creation, touch and go handling, coordination of control transfer to neighboring facilities, surveillance, and interfacing with external data feeds.

Number of People

14

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C22002-GUAD 3D Visual Upgrade

Project Type

OU Project

Project Description

Addition of a 3D Visual Solution to the AURORA STSS Training platform for the air traffic Tower and Approach system at the Pointe a Pitre airport in Guadeloupe.

Number of People

1

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C21910-Nav Portugal Amendment 9 - Phase 4

Project Type

OU Project

Project Description

Updating existing ATM SATL system by implementing phase 4 of the PBO contract: System Optimization, HMI Enhancement, AIDC`OI Improvement and Function Assignment and Permissions.

Number of People

3

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C22016-CACAO3 Finale

Project Type

OU Project

Project Description

Migration of the AURORA 1.3.0 Software on the new hardware plateform based on VMware VSAN architecture on the CACAO ATM System currently in operation in Cayenne, Guyane française. An update will also be required to the configuration files used to monitor the networked equipment through SNMP protocols on the Centralied Monitoring System (CMS).

Number of People

4.5

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C22023-ST Lucia

Project Type

OU Project

Project Description

Configuration and deployment of Adacel’s Aurora system for the purpose of supporting air traffic Tower and Approach management system at the Hewanorra and George F. Charles in St-Lucia, West Indies.

Number of People

3

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C22106-SCAA Seychelles

Project Type

OU Project

Project Description

Development of SCAA specific requirements and deployment of Adacel’s Aurora system for the purpose of supporting air traffic Tower and Approach management system at the Seychelles International Airport FSIA - Mahé island and Praslin Island Airport in Seychelles. Includes the deployment of Saab ADSB Ground Station and our AeroBooks ABS solution.

Number of People

6

Location

Montreal, Quebec Canada

Subgroup

RealTime


Project Name

C22015- Congo 2D Tower

Project Type

OU Project

Project Description

The provision, installation and commissioning of Adacel’s MaxSim air traffic control 2D simulator system at the Institut Supérieur de Techniques Appliquées (ISTA), located in Congo Kinshasa (DRC), to support training and certification of ab-intio and experienced Air Traffic Controllers

Number of People

1

Location

Montreal, Quebec Canada

Subgroup

Simulation


Project Name

C22022-Tunisia AF Tower Simulator

Project Type

OU Project

Project Description

The provision, installation and commissioning of Adacel’s MaxSim air traffic control 3D simulator system at the Ecole Aviation Borj El Am, located in Tunis, Tunisia, to support training and certification of ab-intio and experienced Air Traffic Controllers

Number of People

5

Location

Montreal, Quebec Canada

Subgroup

Simulation


Project Name

A31905- RAAF TVSS Tech Upgrade

Project Type

OU Project

Project Description

The provision of services through upgrading the operating systems to Windows 10 and Cent OS 7.5 for the MaxSim software functionality.

Number of People

2

Location

Montreal, Quebec Canada

Subgroup

Simulation


Project Name

A31807 RAAF SimCare 2018 SP10

Project Type

OU Project

Project Description

The provision of services, through a Service PAck software release, to correct existing issues reported from the field for the Royal Australian AF, which will deployed throughout their various training sites.

Number of People

2

Location

Montreal, Quebec Canada

Subgroup

Simulation


Project Name

U02012 USAF Eng

Project Type

OU Project

Project Description

New functionality and enhancemnets as requested by the sites

Number of People

3

Location

Montreal, Quebec Canada

Subgroup

Simulation


OU Description

Design, Develop and Maintain Air traffic control simulation and operational solutions. Supply simulators for the training of air traffic controllers in both civil and defense environments and for research, planning and modeling of air traffic procedures, as well as provide operational Air Traffic Management systems for airspace control and management in a surveillance environment

Relevant Sampling Factors

Type of Work: Two types of work: Simulation Software and Traffic Management Software

Sampling Factor Values

ATC: Air Traffic Control Simulation and Training Software development

ATM: Air Traffic Management Real-Time Software Development

Subgroups

RealTime

Simulation


Model

CMMI V2.0
EST
Capability Level 3 Satisfied
GOV
Capability Level 3 Satisfied
II
Capability Level 3 Satisfied
MC
Capability Level 3 Satisfied
PI
Capability Level 3 Satisfied
PLAN
Capability Level 3 Satisfied
PR
Capability Level 3 Satisfied
RDM
Capability Level 3 Satisfied
RSK
Capability Level 3 Satisfied
TS
Capability Level 3 Satisfied
VV
Capability Level 3 Satisfied