CMMI Institute

« Appraisal Overview

ZEALCAN Technology co.,ltd. (智瞻科技股份有限公司)

R&D Department (研发部)

Appraisal Details

Organization

ZEALCAN Technology co.,ltd. (智瞻科技股份有限公司)

Organizational Unit

R&D Department (研发部)

Appraisal Team Leader

Tao Zhang

Partner

Shenzhen Baolong Information Technology

Sponsors

Bin He

Appraisal Type

Benchmark

Last day On-site

2022/04/17

Appraisal Expiration Date

2025/04/17


R&D Department Project Description

Organizational Unit

R&D Department

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

92.7%

Sample Size - Projects

85.7%


Project Name

EPG

Project Type

Organizational Project

Project Description

Group for Process management and improvement

Number of People

2

Location

Hefei, Anhui China

Subgroup


Project Name

OT

Project Type

Organizational Project

Project Description

Responsible for organizational training

Number of People

1

Location

Hefei, Anhui China

Subgroup


Project Name

QA

Project Type

Organizational Project

Project Description

Provide Quality Assurance services for all of the projects

Number of People

1

Location

Hefei, Anhui China

Subgroup


Project Name

CM

Project Type

Organizational Project

Project Description

Responsible for Configuration Management

Number of People

1

Location

Hefei, Anhui China

Subgroup


Project Name

Substation intelligent auxiliary system

Project Type

OU Project

Project Description

Take the station end audio and video, environmental data, safety and security information, and transmit the information to the main station and operation and maintenance station of auxiliary equipment centralized monitoring system of prefecture and municipal companies and provincial maintenance companies. The substation intelligent auxiliary system fully reflects the information sharing and information interaction among subsystems, realizes intelligent management of relevant links, realizes remote monitoring of scene conditions in the substation area, and carries out all-weather state monitoring of the main electrical equipment, key equipment installation sites and surrounding environment of the whole station

Number of People

8

Location

Hefei, Anhui China

Subgroup

Group 2


Project Name

Comprehensive monitoring system of substation auxiliary equipment

Project Type

OU Project

Project Description

Through the construction of comprehensive monitoring system for auxiliary equipment in the substation, the comprehensive monitoring of auxiliary equipment in the substation is realized. The station side monitoring system of auxiliary equipment shall be built in the substation to realize the standard access of auxiliary equipment such as safety prevention, environmental monitoring, SF6 monitoring and lighting control; Realize the operation monitoring, operation control, authority configuration, data storage and report generation of auxiliary equipment.

Number of People

11

Location

Hefei, Anhui China

Subgroup

Group 1


Project Name

Substation intelligent inspection system

Project Type

OU Project

Project Description

The substation intelligent inspection system can assist in the intelligent inspection of robot equipment in the station under high voltage and strong magnetic environment. It is equipped with high-definition visible light camera, infrared thermal imager and other detection equipment. The high-definition video monitoring solves the problems of insufficient definition of traditional analog video and aging line interference. The main monitoring scope is entrance and exit, perimeter wall, main channel, important equipment To realize intelligent patrol and auxiliary monitoring of main areas and equipment in the substation.

Number of People

14

Location

Hefei, Anhui China

Subgroup

Group 1


OU Description

Be responsible for the company's software development direction planning and the formulation of the overall planning scheme of the software system; Responsible for the research and development of the company's basic framework; Assist in solving difficult technical problems such as framework in the project; Promote the research and development of product projects.

Relevant Sampling Factors

Type of Work: New Product Projects and Old Product Maintainance Projects

Sampling Factor Values

New Product Projects: New Product Projects

Old Product Maintainance Projects: Old Product Maintainance Projects

Subgroups

Group 1

Group 2


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied