CMMI Institute

« Appraisal Overview

Aerospace Yinshan Electric Co.,Ltd

R&D Center (Chinese)

Appraisal Details

Organization

Aerospace Yinshan Electric Co.,Ltd

Organizational Unit

R&D Center (Chinese)

Appraisal Team Leader

Prakash Hegde

Partner

QAI India

Sponsors

Chunyin Chen

Appraisal Type

Benchmark

Last day On-site

2022/08/06

Appraisal Expiration Date

2025/08/06


R&D Center Project Description

Organizational Unit

R&D Center

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

78.9%

Sample Size - Projects

87.5%


Project Name

Southern power grid intelligent oscillograph

Project Type

OU Project

Project Description

Project:Southern power grid intelligent oscillograph Customer:China Southern Power Grid Product functions: It meets the enterprise standard of China Southern Power Grid. The recording unit of China Southern Power Grid serves as the supporting unit and participates in and passes the cape test of China Southern Power Grid.

Number of People

6

Location

Zhuhai, Guangdong China

Subgroup

China Power Grid


Project Name

Transformer substation comprehensive monitoring system

Project Type

OU Project

Project Description

Project:transformer substation comprehensive monitoring system Customer: China Power Grid Product function: Aiming at the planning and development direction of China Power Grid and China Southern Power Grid in the field of smart substation, a device that can be deployed at substation station and integrates the functions of fault recording, network recording analysis and secondary equipment status monitoring is developed, which is composed of comprehensive application unit and acquisition unit. The substation comprehensive monitoring system covering secondary equipment and loop such as acquisition and execution unit, protection device, safety automatic device, multi-function measurement and control device is realized.

Number of People

8

Location

Zhuhai, Guangdong China

Subgroup

China Power Grid


Project Name

Hybrid frequency conversion fault recorder

Project Type

OU Project

Project Description

Project: Hybrid frequency conversion fault recorder Customer: International requirements of Marketing Department Product functions: By integrating the existing digital, analog and hybrid recorders, we study the frequency conversion technology of recorders, and build a universal recorder platform to meet the needs of domestic and international markets.

Number of People

7

Location

Zhuhai, Guangdong China

Subgroup

China Power Grid


Project Name

On-line monitoring and analysis system of relay protection and safety automatic device

Project Type

OU Project

Project Description

Project: Relay protection and safety automatic device on-line monitoring and analysis system Customer: State Power Grid Shanxi Electric Power Co., LTD Product functions: The construction of a "relay protection online Monitoring, fault warning and Analysis of the main station" system, the system is fully compatible with the "QGDW 11361-2014 intelligent Substation protection equipment online monitoring and diagnosis technical specifications" and maximize compatibility with the established traditional substation and hybrid substation.

Number of People

5

Location

Zhuhai, Guangdong China

Subgroup

China Power Grid


Project Name

Standardize distribution terminal DTU

Project Type

OU Project

Project Description

Project: Standardized distribution terminal DTU Customer: Marketing Department needs Product functions: Distribution terminal DTU is mainly used for monitoring in switching station, switching station, cable dividing room, ring network cabinet and distribution room, low-voltage substation and other places. Can complete opening and closing, switching stations, cable by separating room and transformer room, low voltage substation internal feeder monitoring, able to identify fault feeder, cooperate with the main or sub station system power distribution automation system, which can realize multiple lines of acquisition and control, fault detection, fault location, fault isolation and the failure to restore power in the region and improve the power supply reliability..

Number of People

6

Location

Zhuhai, Guangdong China

Subgroup

Carbon peak and carbon neutralization


Project Name

EPG

Project Type

Organizational Project

Project Description

Responsible for process definition and standardization, process asset library creation , maintenance, Continuous process improvement

Number of People

2

Location

Zhuhai, Guangdong China

Subgroup


Project Name

OT

Project Type

Organizational Project

Project Description

Responsible for common process, technical, domain, softskill training needs analysis, strategic training planning, conduct of training, maintenance of training records

Number of People

1

Location

Zhuhai, Guangdong China

Subgroup


Project Name

QA

Project Type

Organizational Project

Project Description

Responsible for quality assurance audit planning, Conduct of internal process compliance audits, reporting audit findings, identifying improvement opportunities, followup on audit findings closure

Number of People

1

Location

Zhuhai, Guangdong China

Subgroup


OU Description

The R&D center is responsible for software products catering to China power grid tender and Carbon peak and carbon neutralization. The projects cater to Substation products, distribution network products. Such as: environmental protection gas insulated ring network cabinet, solid insulated ring network cabinet, fully insulated and fully sealed SF6 ring network switch equipment, outdoor column switch, complete set of high and low voltage switch equipment, active filter cabinet, relay protection device, FTU, DTU, fault indicator, fault recorder, fault information system master/sub-station, power quality monitor, etc.

Relevant Sampling Factors

Customer: The R&D center caters to software projects for 2 customers- China power grid tender and Carbon peak and carbon neutralization There is process variation across the 2 customers based on customer requirements and the customer operating context. Hence "customer" is selected as a Sampling factor

Sampling Factor Values

China power grid tender: Software projects delivered to China Power grid

Carbon peak and carbon neutralization: Software projects delivered to Carbon peak.

Subgroups

Carbon peak and carbon neutralization

China Power Grid


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied