CMMI Institute

« Appraisal Overview

ANHUI SANLIAN APPLIED TRAFFIC TECHNOLOGY CO., LTD. (安徽三联交通应用技术股份有限公司)

Software Function in New Development and Feature Enhancement Projects in R&D Department (开发部软件类新开发与升级型项目)

Appraisal Details

Organization

ANHUI SANLIAN APPLIED TRAFFIC TECHNOLOGY CO., LTD. (安徽三联交通应用技术股份有限公司)

Organizational Unit

Software Function in New Development and Feature Enhancement Projects in R&D Department (开发部软件类新开发与升级型项目)

Appraisal Team Leader

Chen Wang

Partner

CEPREI Certification Body

Sponsors

Kei Jin

Appraisal Type

Benchmark

Last day On-site

2022/09/22

Appraisal Expiration Date

2025/09/22


Software Function in New Development and Feature Enhancement Projects in R&D Department Project Description

Organizational Unit

Software Function in New Development and Feature Enhancement Projects in R&D Department

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

69.2%

Sample Size - Projects

100%


Project Name

QA

Project Type

Organizational Project

Project Description

PQA for projects and organization

Number of People

0.5

Location

Hefei, Anhui China

Subgroup


Project Name

EPG

Project Type

Organizational Project

Project Description

Process improvement function

Number of People

0.5

Location

Hefei, Anhui China

Subgroup


Project Name

OT

Project Type

Organizational Project

Project Description

Organizational Training

Number of People

0.5

Location

Hefei, Anhui China

Subgroup


Project Name

CM

Project Type

Organizational Project

Project Description

Configuration Management for projects and organization.

Number of People

0.5

Location

Hefei, Anhui China

Subgroup


Project Name

P1

Project Type

OU Project

Project Description

Feature enhancement of Vehicle Test Subject 2 System by refactoring code base from C/Delphi to C# and modify system architecture

Number of People

4

Location

Hefei, Anhui China

Subgroup

Feature Enhancement


Project Name

P2

Project Type

OU Project

Project Description

Feature enhancement of Vehicle Test Subject 3 System by refactoring code base (from C/Delphi to C#) and system architecture, and adding some features according to Requlation # 162.

Number of People

5

Location

Hefei, Anhui China

Subgroup

Feature Enhancement


Project Name

P3

Project Type

OU Project

Project Description

Development of Vehicle Test C6 System based on new vehicle type including testing processes and information management.

Number of People

8

Location

Hefei, Anhui China

Subgroup

New Development


Project Name

P4

Project Type

OU Project

Project Description

Development of Intelligent Training and Examination System for government transportation training.

Number of People

5

Location

Hefei, Anhui China

Subgroup

New Development


OU Description

The OU is defined as Software Function in New Development and Feature Enhancement projects in R&D Department, which the later is built upon existing products and the former is developed from ground-up. Although in a system viewpoint the hardware, mechanical, and manufacturing support are all included but only the software function is in the appraisal scope. R&D Department is responsible for system development and operation support including software, hardware, mechanical, and transitioning to manufacturing, and the appraisal scope is only applied to R&D Department's Software Function only, which means the software sub-system of the entire product (system) focusing on software application development or feature enhancement, and is integrated into system containing hardware, mechanical parts and manufacturing function by considering external interfaces to those sub-systems. R&D Department is also responsible for support functions including QA, CM, OT, and EPG.

Relevant Sampling Factors

Type of Work: There are 2 types of work: New Development and Feature Enhancement. Feature Enhancement projects are executed on the basis of existing system while New Development is not. This creates process differences in Requirement Development, System Design and Component Reuse, Product Integration and testing.

Sampling Factor Values

New Development: New Development projects which start from ground up without existing system but with common platform supports regarding to flow engine, user management, system log management, and some security features.

Feature Enhancement: Feature Enhancement projects which is built on existing product by modifying architecture or features.

Subgroups

Feature Enhancement

New Development


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied