CMMI Institute

« Appraisal Overview

ZHEJIANG JUNLANG ELECTRIC AUTOMATION CO.,LTD (浙江俊朗电气自动化股份有限公司)

R&D Department (研发部)

Appraisal Details

Organization

ZHEJIANG JUNLANG ELECTRIC AUTOMATION CO.,LTD (浙江俊朗电气自动化股份有限公司)

Organizational Unit

R&D Department (研发部)

Appraisal Team Leader

Bandaru Chandrasekhar Rao

Partner

Fusion Tech Process Consulting

Sponsors

Qunhua Wang

Appraisal Type

Benchmark

Last day On-site

2022/09/30

Appraisal Expiration Date

2025/09/30


R&D Department Project Description

Organizational Unit

R&D Department

Model or Model View

CMMI Development V2.0 (CMMI-DEV) without SAM - Maturity Level - 3

Sample Size - People

100%

Sample Size - Projects

100%


Project Name

Engineering Process Group

Project Type

Organizational Project

Project Description

Establish Engineering process group (EPG) to undertake the task of evaluating and adjusting software process for a long time.

Number of People

1

Location

Leqing, Zhejiang China

Subgroup


Project Name

Process Quality Assurance

Project Type

Organizational Project

Project Description

Responsible for product and process quality assurance.

Number of People

1

Location

Leqing,, Zhejiang China

Subgroup


Project Name

Configuration Management

Project Type

Organizational Project

Project Description

Responsible for the company's software products and their development process life cycle and product configuration management.

Number of People

1

Location

Leqing, Zhejiang China

Subgroup


Project Name

Organization Training (OT)

Project Type

Organizational Project

Project Description

Responsible for the company's human resource management, training and other related work.

Number of People

1

Location

Leqing, Zhejiang China

Subgroup


Project Name

Integrated office management system

Project Type

OU Project

Project Description

The enterprise can realize office processing business automation, maximize office efficiency, improve office quality, improve office environment and conditions, improve decision-making, reduce or avoid all kinds of errors and drawbacks, shorten the office processing cycle. The main function modules include system management module, human resources management module, personal office management module, public affairs management module, document processing module, multi-channel inquiry module, information exchange module and so on.

Number of People

7

Location

Leqing, Zhejiang China

Subgroup

Integrated Management System


Project Name

Electrical performance testing system

Project Type

OU Project

Project Description

In order to improve the time efficiency of the device under test to 2-15 times, the matrix algorithm and multi-thread data analysis and calculation software developed by our company's electrical performance testing system concurrently sampled the data collected by the network divider to the system for multi-core processing and analysis, so as to get rid of the processing load of the instrument's own analysis data. With data docking interface function, it can seamlessly interconnect with any other system (such as MES\OA\ERP) or database, and support S2P custom saving, data analysis, curve, matrix calibration, report customization and other functions. The calibration adopts the full-matrix calibration algorithm developed by our company. The full-matrix isolation calibration usually takes only a few minutes to calibrate the complete channel, which greatly improves the calibration speed and equipment utilization.

Number of People

5

Location

Leqing, Zhejiang China

Subgroup

Data Analysis System


Project Name

Production status display integrated management system

Project Type

OU Project

Project Description

In order to strengthen the management of the production organization process in the factory floor, the relevant information can be visually transformed, the transfer can be fast, the process process is transparent, and the efficiency of the production organization can be improved, so the production status display integrated management system is developed. The system can realize rapid information transfer, application call, real-time display, statistical analysis, report generation, and so on. It can carry out real-time information transfer and management on process operation, equipment status, quality problems, material supply and other processes, and constitute support for the whole process of production. The production schedule and production status are visualized by graphic technology, which makes the process of production flow transparent and intuitive, and realizes the control of the global production information. The system is integrated with ERP information system to realize the information of production data, so it can realize the statistics, analysis, prediction, simulation and so on.

Number of People

5

Location

Leqing, Zhejiang China

Subgroup

Integrated Management System


Project Name

Order financial analysis system

Project Type

OU Project

Project Description

Order number in system, through the access MES/ERP/PLM system costs, such as combination of data and each department manual input data, according to the requirements management leadership at all levels to deal with the related data analysis, can be quickly obtained product of material cost, labor costs, expenses, taxes and profits intuitive comparison data, according to manager access to generate the corresponding data report, For managers at all levels to analyze and make decisions, in order to help all links and departments to reduce costs and expenses to take better and faster measures.

Number of People

6

Location

Leqing, Zhejiang China

Subgroup

Data Analysis System


OU Description

负责新产品设计和开发,实施分阶段的质量控制,保证产品设计质量满足规定要求Responsible for new product design and development, implement quality control in stages, ensure product design quality meets the requirements

Relevant Sampling Factors

Type of Work: enterprise custom developments projects daily on the data analysis to improve performance and integrated management systems to maximize the efficiency and quality

Sampling Factor Values

Data Analysis system: Projects to improve the testing performance and financial decision making with proper data analysis.

Integrated Management system: To improve the office efficiency and quality of work and projects to manage the dashboard using integrated management systems.

Subgroups

Data Analysis System

Integrated Management System


Model View

CMMI Development V2.0 (CMMI-DEV) without SAM

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied