CMMI Institute

« Appraisal Overview

Zhejiang Neng Wei Gongzhi Technology Co., LTD. (浙江能维共智科技有限公司)

Technical Department (技术部)

Appraisal Details

Organization

Zhejiang Neng Wei Gongzhi Technology Co., LTD. (浙江能维共智科技有限公司)

Organizational Unit

Technical Department (技术部)

Appraisal Team Leader

Wei Huang

Partner

Sinociple

Sponsors

Hengjie Gui

Appraisal Type

Benchmark

Last day On-site

2023/03/15

Appraisal Expiration Date

2026/03/15


Technical Department Project Description

Organizational Unit

Technical Department

Domain

CMMI Development - Maturity Level - 3

Sample Size - People

83.8%

Sample Size - Projects

88.9%


Project Name

EPG

Project Type

Organizational Project

Project Description

Number of People

1

Location

Subgroup


Project Name

OT

Project Type

Organizational Project

Project Description

Number of People

1

Location

Subgroup


Project Name

QA

Project Type

Organizational Project

Project Description

Number of People

2

Location

Subgroup


Project Name

Test Group

Project Type

Organizational Project

Project Description

Number of People

5

Location

Subgroup


Project Name

Asset Management System Project of Zhejiang City Digital Technology Co., LTD.

Project Type

OU Project

Project Description

Number of People

5

Location

Subgroup

Application Projects


Project Name

Phase II of Comprehensive Energy Conservation Project of Yuhang Smart Grid Industrial Base

Project Type

OU Project

Project Description

Number of People

6

Location

Subgroup

Application Projects


Project Name

Smart Power Energy Control System Project

Project Type

OU Project

Project Description

Number of People

5

Location

Subgroup

Application Projects


Project Name

Application Research of Intelligent Operation and Maintenance of Substation Based on Digital Twin Theory

Project Type

OU Project

Project Description

Number of People

5

Location

Subgroup

Presentation Projects


Project Name

Jiande Digital Twin Smart Factory System

Project Type

OU Project

Project Description

Number of People

5

Location

Subgroup

Presentation Projects


OU Description

The technology department (the OU) is mainly for the customer group of building complex. The main core is the software products for operation, maintenance and management of smart buildings. At the same time, the product development will also gradually evolve to the office, tourism, science, education, culture and health, communications, transportation, industry and other professional fields. Use JAVA, C#, html+css+Javascript, .NET/C#, MVVM, loC/DI and other IT technologies to carry out software development, support and management, technical testing, etc. At present, the technology department has about 35 people, including project managers, designers, development engineers, test engineers, etc.

Relevant Sampling Factors

Type of Work: The appraised projects are divided into two categories in terms of Type of Work.

Sampling Factor Values

Presentation Projects: 1. Party A has its own data center, which provides the upper application system with standard http protocol. OU projects just make customized development and data visualization based on the obtained protocol data. 2. Party A provides the interface protocol specification document, and OU projects obtain the verification interface data through the interface protocol test tool, and then conduct the code development and test.

Application Projects: 1. The overall development and implementation process of the project involves data acquisition at the bottom, data presentation at the top, reverse control logic or customization of business processes, which are all developed by OU appraised. 2. Develop data acquisition control package according to the equipment's own protocol, collect data to the middle platform which was built by OU, and provide support for upper applications.

Subgroups

Application Projects

Presentation Projects


Domains

Development

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied