Zhejiang Neng Wei Gongzhi Technology Co., LTD. (浙江能维共智科技有限公司)
Technical Department (技术部)
Technical Department (技术部)
Zhejiang Neng Wei Gongzhi Technology Co., LTD. (浙江能维共智科技有限公司)
Technical Department (技术部)
Wei Huang
Sinociple
Hengjie Gui
Benchmark
2023/03/15
2026/03/15
Technical Department
CMMI Development - Maturity Level - 3
83.8%
88.9%
EPG
Organizational Project
1
OT
Organizational Project
1
QA
Organizational Project
2
Test Group
Organizational Project
5
Asset Management System Project of Zhejiang City Digital Technology Co., LTD.
OU Project
5
Application Projects
Phase II of Comprehensive Energy Conservation Project of Yuhang Smart Grid Industrial Base
OU Project
6
Application Projects
Smart Power Energy Control System Project
OU Project
5
Application Projects
Application Research of Intelligent Operation and Maintenance of Substation Based on Digital Twin Theory
OU Project
5
Presentation Projects
Jiande Digital Twin Smart Factory System
OU Project
5
Presentation Projects
The technology department (the OU) is mainly for the customer group of building complex. The main core is the software products for operation, maintenance and management of smart buildings. At the same time, the product development will also gradually evolve to the office, tourism, science, education, culture and health, communications, transportation, industry and other professional fields. Use JAVA, C#, html+css+Javascript, .NET/C#, MVVM, loC/DI and other IT technologies to carry out software development, support and management, technical testing, etc. At present, the technology department has about 35 people, including project managers, designers, development engineers, test engineers, etc.
Type of Work: The appraised projects are divided into two categories in terms of Type of Work.
Presentation Projects: 1. Party A has its own data center, which provides the upper application system with standard http protocol. OU projects just make customized development and data visualization based on the obtained protocol data. 2. Party A provides the interface protocol specification document, and OU projects obtain the verification interface data through the interface protocol test tool, and then conduct the code development and test.
Application Projects: 1. The overall development and implementation process of the project involves data acquisition at the bottom, data presentation at the top, reverse control logic or customization of business processes, which are all developed by OU appraised. 2. Develop data acquisition control package according to the equipment's own protocol, collect data to the middle platform which was built by OU, and provide support for upper applications.
Application Projects
Presentation Projects