CMMI Institute

« Appraisal Overview

ZENMORN (HEFEI)TECHNOLOGY CO., LTD. (合肥市正茂科技有限公司)

Technology Department (技术部)

Appraisal Details

Organization

ZENMORN (HEFEI)TECHNOLOGY CO., LTD. (合肥市正茂科技有限公司)

Organizational Unit

Technology Department (技术部)

Appraisal Team Leader

Won Ho Cho

Partner

PAC Consulting

Sponsors

Lv Qiang

Appraisal Type

Benchmark

Last day On-site

2023/10/20

Appraisal Expiration Date

2026/10/20


Technology Department Project Description

Organizational Unit

Technology Department

Domain

CMMI Development - Maturity Level - 3

Sample Size - People

90.3%

Sample Size - Projects

85.7%


Project Name

EPG

Project Type

Organizational Project

Project Description

Number of People

2

Location

Subgroup


Project Name

Project Quality Assurance Executive (PQAE)

Project Type

Organizational Project

Project Description

Number of People

1

Location

Subgroup


Project Name

Configuration Manager (CM)

Project Type

Organizational Project

Project Description

Number of People

1

Location

Subgroup


Project Name

Organizational Training

Project Type

Organizational Project

Project Description

Number of People

1

Location

Subgroup


Project Name

*Sensitive

Project Type

OU Project

Project Description

*Sensitive

Number of People

7

Location

Subgroup

Waterfall Lifecycle


Project Name

*Sensitive

Project Type

OU Project

Project Description

*Sensitive

Number of People

8

Location

Subgroup

Iteration Lifecycle


Project Name

*Sensitive

Project Type

OU Project

Project Description

*Sensitive

Number of People

7

Location

Subgroup

Waterfall Lifecycle


OU Description

Technology Department is committed to providing the applications by using multi-dimensional AI artificial intelligence multi-dimensional perception technology, in the field of the smart traffic overrun management and urban safety bridge protection. Some of the system developed include overrun detection off-site law enforcement systems, weighing system, vehicle Contour recognition system, source control management system, vehicle monitoring bridge protection system etc. The detailed responsibilities: 1. Conduct the preliminary technical investigation, project approval, requirement pre-research, requirement analysis, system development, system deployment and implementation of the company's software products. 2. Conduct design analysis and overall planning of software project development. 3. Effectively monitor the development progress and testing progress of the project. 4. Collect and analyze the data from the project implementation.

Relevant Sampling Factors

Project Lifecycle: Work is performed differently based on the lifecycles. The lifecycles applied mainly include: 1. Waterfall Lifecycle Model: To develop the project by folllowing waterfall lifecycle model.(P1, P3) 2. Iteration Lifecycle Model: To develop the project by following iteration lifecycle model.(P2)

Sampling Factor Values

Waterfall Lifecycle: To develop the project by folllowing waterfall lifecycle model.(P1, P3)

Iteration Lifecycle: To develop the project by following iteration lifecycle model.(P2)

Subgroups

Iteration Lifecycle

Waterfall Lifecycle


Domains

Development

Maturity Level

3
CAR
Satisfied
CM
Satisfied
DAR
Satisfied
EST
Satisfied
GOV
Satisfied
II
Satisfied
MC
Satisfied
MPM
Satisfied
OT
Satisfied
PAD
Satisfied
PCM
Satisfied
PI
Satisfied
PLAN
Satisfied
PQA
Satisfied
PR
Satisfied
RDM
Satisfied
RSK
Satisfied
TS
Satisfied
VV
Satisfied